12 Tips to Make Decisions Faster with Less Stress

The real challenge of engineering is making good decisions especially when we don’t have all the data.

Here are several keys to making a low stress decision:

  1. Have a clear objective
  2. Set a short time limit
  3. Limit the number of decisions you make
  4. Don’t make the same decision twice
  5. Know when to bring someone else into the decision
  6. Don’t overthink the problem
  7. Choose the simpler solution
  8. Commit now, but decide later
  9. Use a decision matrix
  10. Sleep on it
  11. Pick at random
  12. Embrace Failure

Yes, as an engineer, you will make lots of decisions every day.  Most of these decisions are quick and easy so we won’t discuss those here.  Our education has taught us a lot of knowledge and analysis techniques.  Sometimes those tools lead us directly to a solution, but many times, there are two or more equally good solutions.  This is where experience and wisdom come into play. 

In the engineering world, we are definitely caught between being the first to the market and having a quality product from the start.  Poor quality can be improved upon, but there are cases where extremely poor quality has given that market a black eye.  One example that comes to mind is the use of fiber optic controls on outdoor equipment in the late 1980s. The quality of the system was so poor that fiber optics were pretty much a four letter word until all those familiar with it retired.  In the meantime, computers and other related technology made significant strides, but still could not be used in this market.

I’ll be honest, there are times when I don’t want to make a decision, but it needs to be made.

Let’s explore each of these items.

1.  Have a clear objective

This by far is the most important step in making a decision.  The better you can describe what the ideal solution is the easier your decision will be.  If you have no idea what a good or bad idea looks like, you will never get close to making a decision.  Spend time analyzing exactly what works in similar designs as well as what won’t work and be very specific.  Come up with a list of important criteria and set weights to them. 

Typical criteria are:

  1. Effectiveness
  2. Robustness
  3. Simplicity
  4. Cost
  5. Time to implement

One part of an objective that is often overlooked is how the solutions line up with your company’s values or mission statement.  Be sure to consider this with every decision.

2. Set a time limit

First off, this is more for little decisions although having a time limit of something like, “I will decide this by the end of the week”, will work as well.  Having a time limit prevents you from procrastinating or spending too much time on small details. 

If you are like me, I hate it when I come back from vacation and there are now 200 emails that I need to sort through.  This is precisely where the timer comes into play.  I will look through each email for 15 to 30 seconds at most.  If the item can be completed in that time or added to a list etc., I do it.  Then the email is archived or deleted.  If it requires more time, I mark it as unread and leave it alone. 

In about 30 minutes, I could get through all 200 emails and be left with around 20 to 40.  I would then repeat the process and give somewhere between two and five minutes for each email.  This generally left me with usually 1 to 5 emails that would take a considerable amount of time to handle.  On average, I think that I could handle the overwhelming majority of emails in 90 minutes.

3. Limit the number of decisions you make

Honestly, we all make too many decisions every day. I once saw a number of 35,000 which makes sense, but wow – that’s a lot!  Luckily, the vast majority are very minor and can be ignored.  However, if you are continually making many large decisions each day, this will likely lead to fatigue. 

If this is the case, you need some help.  If you have the ability to delegate, do so.  If the person you can delegate to isn’t qualified to make a decision, have them do research so your decision is easier.  If you can’t delegate, talk to your boss.  He or she may be able to help.

4. Don’t make the same decision twice

This one is a sneaky son of a gun. I you have decided on a matter, but haven’t committed to it, you are going to keep rethinking the decision until you do.  This is the very definition of stress.  Once decided, lock it in immediately and forget the other options.

5. Know when to bring someone else into the decision

This is easy, but often overlooked. Make sure that you have a trusted group of advisors that you can bounce ideas off of.  They don’t even have to be engineers, in fact sometimes it is better if they aren’t. 

Let me explain.  New and untrained eyes on the problem will force you to explain the problem in great detail and how each potential solution addresses solves the problem.  There have been multiple times where just in explaining the problem to someone else, the solution presented itself.

6. Don’t overthink the problem

Paralysis by analysis is a real thing. Sorting out what data is important or not is imperative.  Often time having less data is more helpful in making a decision.  In general, engineers want to be 100% confident that our solution will work, but that is never the case.  We can always run more tests, try other solutions and consider more variables, but we are just prolonging the decision.  Know when you have enough information to make a decision.

7. Choose the simpler solution

Yes, if you have two solutions that are pretty much equal, choose the simpler one. In my experience, there is less that can go wrong with simplicity.  I know the adage of the engineer is “if it isn’t broke, it doesn’t have enough features,” but not everything needs to have every feature.  I prefer “not broke” over features every day.

8. Commit now, but decide later

This is an interesting approach that I was just made aware of recently. Make no mistake, this is not procrastinating, but rather a method of getting you in the habit of making quicker decisions without the fear of regret. 

It works like this: your boss asks if you have decided whether Solution A or Solution B is the way to go.  Solution B is clearly the better choice, so you say we should proceed with that.  However, you also add that you would like to run a quick test on Solution B to confirm that it is the best choice. 

What you have done is instill confidence in your decision to your boss, but left an ‘out’ in case the test fails.  We do this when buying a home where we put a little money down at the offer, but we can back out after we run our tests, namely a home inspection, before we close.  There is tremendous benefit in expressing commitment, but deciding later. 

I will caution you that your test should be brief when compared to the decision timeline.  Otherwise, you are just procrastinating.

9. Use a decision matrix

A decision matrix is a tool that allows you to visibly weigh multiple criteria against multiple potential solutions. This is done by assigning certain weights and values for each solution against those weighted criteria.  When done right, either by yourself or with a group, certain solutions will come to the front and others will retreat. 

However, if you have one option that scores slightly higher than another, it doesn’t necessarily mean that it is better.  This is a tool and it still needs interpretation by you, a qualified engineer.

10. Sleep on it

Ok, this also is not procrastination as long as you set a time limit. Our brains are amazing computers, but we need time and often a change of scenery to process the decision.  Sleep and “windshield time,” (the time spent driving to and from work looking through a windshield) are miracle workers when it comes to clearing out your brain and making good decisions.

11. Pick at random

Yes, it seems ridiculous, but if all the solutions are equal, pick a solution at random. Write the option on sticky notes and pick them from a hat. 

12. Embrace the Fear of Failure

We knew this one was coming. Yeah, we are all going to make a bad decision and some of them will be big ones.  Notice the title says, “the FEAR of Failure,” and not failure itself.  Failure is not eminent!  This is often the cause of dragging our feet or not making a decision at all. 

Personally, I have a goal to fail for one reason.  When you fail you tend to learn more, after all, you will learn more from one failure than from a thousand successes

Engineering disasters like the failure of the Tacoma Narrows Bridge or the oil spill from the Exxon Valdez taught us far more than a hundred good bridges or oil transport successes.  My point is that failures are something we learn from and we should not put off making decisions because of fear.  Failure will occur, give it a big hug and learn from it.

Limit Linear Forces with This Simple Mechanical Device

The Problem:

There have been several times in my engineering career that I have needed to limit the force a mechanism can produce, but still allow for unpredictable amounts of deflection.  This is very useful in cyclical testing when the test piece needs to have a certain load applied to it over and over.  Usually in situations like this, you want to be able to setup a test machine and let it run continuously without the need for babysitting it.

Generally speaking for an application like this, using a rotating motor with a cam makes the most sense.  The cam would then be attached to the test piece as shown.  However, I can only produce the correct force when the test piece, link, motor and cam are all perfectly spaced when the cam is at its apex.  Even if I could get this right, the nature of machines is that they wear. 

If my test component needs 100 lbs. applied repeatedly, I could set that, but by cycle 1000, I could have worn multiple parts and lost most if not all my initial force.  The cause of this is simply increased distance or deflection.  At this point, you could design a complex control system to monitor the force and make adjustments to the spacing or the cam offset, but that sounds like a lot of work and money to me.  I’m just not interested in that and you shouldn’t be either.

So here’s the solution:

We need to have a way to insert some flexibility into the system.  The obvious place is to look at the link.  The solution is to replace a fixed link with a rod and tube connected by springs.  Yes, springs are the key to all this.  So we may remember that a spring follows the formula F = k * x.  Where F is force, something we are interested in, k is the spring constant and x is the deflection. 

The mechanism shown below consists of several parts: the outer shell, the springs, the rod and some hardware.  It is a pretty simple mechanism, but the most important and difficult part is selecting the springs.

What kind of springs do I use?

This is a great question.  So this device will be used in tension, so we will need to use compression springs or perhaps Bellville washers.  If springs are chosen, be sure to select closed and ground so that they can stack easily.  To select the right spring, we must first decide what our load range is.  Generally this should be about +/- 5%, but we can bias this.  In our example of a nominal 100 lb, are we ok with 95 lb. to 105 lb.?  We could also bias this to be 100 lb. to 110 lb. 

For this case, we will have the maximum load at 110 lb.  We should definitely select the maximum loading of our spring to be at least 10% more than our capacity.  We also want to look for a relatively low spring rate.  In this case I looked at McMaster Carr and selected 9657K451.  This is a spring with 124 lb. max load, a spring rate of 127.3 lb. /in, a free length of 3.50 in and a compressed length of 2.49 in.  This spring should do fine.

How do I plan for deflection?

To estimate the deflection, be sure to consider all the components involved because they will all add up together.  If we estimate this at a quarter inch, I would plan to double that in our calculations.  With this apparatus, it is much easier to minimize deflection than to add. 

In this case we will use half an inch as our delta, Δ.  So let us look at what kind of deflection we anticipate.  Using the spring equation, we will solve for x using the differential force required. 

110 (lb.) -100 (lb.) = 127.3 (lb. / in) * x (in); x = 0.078 in

As you can see, there is very little deflection.  What we need to do now is put multiple springs in series so that the deflections add up, but the force remains the same.  We can now calculate the number of springs needed.

Δ = 0.50 in = n * 0.078 in; n=6.4

So we will need seven springs in series to give us the characteristics we want. 

Designing the Housing

We are ready to start designing the rest of the machine.  From our spring catalogue, we see that the outside diameter is 0.625 in and the inside diameter is 0.385 in.  For the rod, threaded rod is the best choice.  It is easily available in a variety of sizes and grades.  This will be the piece that we set our target force with so we want the infinite adjustment it gives.  The logical choice here is using 3/8-16 threaded rod because it is 0.010” smaller and provides a great pilot for the springs.  The pilot is important because it ensures that the springs stay stacked properly.

The outside housing is a little more difficult.

We have to be strong enough to carry the load, be able to assemble it and most important, we don’t want to have to machine a bunch of parts.  The best solution I’ve found is using threaded pipe with pipe end caps.  It allows for items to be assembled and requires no additional bolting or machining. 

In our case, a ¾ schedule 40 pipe will work well because it has an ID of 0.824 in.  Since we are using seven 3.5” long springs (24.5”) pieces, we need to have at least that length of housing, or do we?  Ok, so we can cheat that a little in this and many other cases.  In this case, I would choose a 2 foot length of pipe since it is commonly available in most hardware stores.

A little fabrication

So we now need to drill a hole in the end of each end cap,  I recommend doing this on a lathe to keep the centers aligned, but in a pinch, doing it by hand will work.  Just make sure you mark the center well and punch it first.  The hole should be sized slightly larger than the threaded rod.

Assembly and calibration

From the drawing you can see that a few nuts, washers and eyebolts complete this assembly.  If eyebolts don’t fit your application, you may need to do a little more engineering work.  Once assembled, you can calibrate by hanging the housing from the crane or other structure. 

Apply a known weight, in our case 100 lb., to the end of the threaded rod.  The rod will extend until equilibrium is reached.  Adjust the two nuts on the rod until it is snug with the housing.  Jam the nuts together to ensure they don’t move.  You can then add another 10 lb. to the existing weight and see how much the nuts extend.  It should be just less than the ½” we planned on. 

If you would like to build this version of a force limiter, this is the bill of materials to do so.  All of these parts are available at McMaster-Carr.

A few final thoughts.

I mentioned using Belleville washers instead of springs.  While Bellville washers will work, you can really only use them with very small deflections.  A good candidate for this application has a deflection of about 0.008 in at rated load.  This would require around 600 washers to get the ½ in of deflection that we needed.  It would also cost and weigh much more and have a longer length.  It is recommended that Bellville washers only be used with deflections that are less than 1/16 of an inch or less.

It is recommended to use a rubber washer in between two larger washers on the threaded rod.  When the link is unloaded, it will make a loud thud otherwise.  I realized this on the first one I built when we needed to run a test that lasted several hours and it annoyed my fellow coworkers (not to mention the headache I got).

Finally, I recommend using this in only tension applications.  You can use it in compressive applications but you need to worry about buckling and eccentric loading.  This is a headache due to all the calculations and tolerances you will need to consider.  You just don’t want to go down that road. 

If your application needs to be in compression, I recommend getting a cylinder and maintaining constant pressure on the extend port.  The other benefit is that if you use a cylinder, you can also make a simple controller for it to cycle the load as well. 

Conclusion

In conclusion, a force limiting device like this is easy to design, assemble and fabricate.  It can make life much easier in situations where you need to apply controlled loads repeatedly.  You can also impress your friends with your smarts at the same time.