We are now nearing the end of major fab and into the nitty gritty.
- Cart assembled
- Tail spike connected
- Capacitor guard installed
- Conduit installed
- Prox switches installed
There are a few things left to do:
- Support the track
- Wire with 120V
- Mount box outside and pull wires