Black Widow Backyard Roller Coaster Image Gallery

Cart Painting and Assembly

Lengthened Lift Hill 07/23/2020

The Track Loop is Complete!

6/29/2020 – There is still bracing and support that needs to be done but the loop is finished. We had a rail joining ceremony and later a “rose gold screw celebration” to fasten the last rail tie. Oh, by rose gold screw, I mean an ordinary deck screw that I painted metallic red.

Retracking of the Initial Drop to Increase Bank Angle

6/15/2020 As with all things, you look at the calculations and the numbers tell you something that isn’t logical. Well, the numbers were wrong and it took 3 days to rebuild the initial drop.

Photos of the Assembled Cart 6/25/2020

Posted 06/06/2020

Posted 05/18/2020

Corey Rasmussen

Corey Rasmussen is an award-winning professional engineer (NC and TX) with over 20 years of product design and development experience. He has two patents related to aerial lifts machinery, has advanced certifications in hydraulics and electronic controls, and specializes in designing mobile equipment. Corey is the principal engineer of Rasmussen Designs and is based out of Durham, NC.

Recent Posts

Save 20% Off Most Items! Use Code: 20%OFF
Save 20% Off Most Items! Use Code: 20%OFF
Shop Now